Skip to content

Tile and slate

Stainless steel hooks that carry the rail clear of concrete tile, clay tile and slate roofs.

Hook, screwed to rafterRail, cut

Tile hook in section along the slope: fixed to the rafter, it passes under the tile above and carries the rail.

Anodised as standard
10 µm
Every aluminium part is AL6005-T5, anodised to 10 µm as standard, not mill finish. Hooks and fasteners are SUS304 stainless steel.
Roof pitch
0° to 30°
Outside this range, a project-specific certificate
Hook spacing
1.5 m
Roof up to 10 m, roof tilt up to 25°, roof zone H
Adjustable hook
56 to 83 mm
Height range of LMS-TH4-KIT
Warranty
20 years
SUS304 hooks and aluminium parts, C1 to C4

Where it fits

For residential and commercial tile roofs in concrete tile, clay tile or slate. The hook is fixed to the rafter and carries the rail without bearing on the tiles.

  • Concrete or clay tile, portrait rows

    LS-RP-07

    Tile hook kit, portrait (LMS-TH1-KIT), L180 × 166 × 155, SUS304.

  • Concrete or clay tile, landscape rows

    LS-RP-08

    Tile hook kit, landscape (LMS-TH2-KIT), SUS304.

  • Uneven batten spacing

    LS-RP-07

    Adjustable tile hook kit (LMS-TH4-KIT), height 56 to 83 mm.

  • Slate

    LS-RP-09

    Slate hook kit (LMS-SH1-KIT), SUS304.

What is in the kit

Choose the hook. The model and the hook code change with it. Select any part for its material and finish.

Hook
Representative model of the tile and slate kit on Concrete or clay tile, assembled
Drag to rotate, select a part for its code
Representative model
Parts in the kit, with catalogue codes. Select a part to show it in the model.
ItemDescriptionCode
1LMS-EC30-35-KIT-BP, LMS-IC30-35-KIT-BP
2LMS-PRO-RAIL47
3LMS-TH1-KIT

Select a part, in the list or in the model, for its code, material and finish.

A representative model for reading the assembly, not a design drawing. PV modules are shown for reference and are not part of the kit. Quantities are set for each project.

Configurations

Three hooks for concrete and clay tile roofs, all from the tile manual.

Specification

From the Lumasol installation manual and product catalogue. Each system is designed for its project and ships with a detailed installation guide.

Compare tile and slate with the other kit families
Tile and slate specification
MaterialsSUS304 stainless steel tile and slate hooks. AL6005-T5 PRO Rail 47 and clamps.
FinishAluminium anodised to 10 µm.
Design basisCertified to AS/NZS 1170.2:2021. Wind regions A to D, up to 20 m installation height.Designed for terrain category C, with spacing factors for A and B.
Roof pitch0° to 30°; outside this range, a project-specific engineering certificate.Full 1.5 m spacing up to 25° roof tilt.
OrientationPortrait (LMS-TH1-KIT) or landscape (LMS-TH2-KIT) hooks.
Corrosion classAnodised aluminium and SUS304 stainless steel: 20 years in C1 to C3 and in C4, not warranted in C5. Screws (1022A, class 3): 20 years in C1 to C3.Reduce interface spacing by 5% in C4.
Interface spacingUp to 1.5 m.Roof height to 10 m, roof tilt to 25° and the array in roof zone H. Hook spacing follows the truss spacing.
Modules30 mm and 35 mm frames, at least 18 mm between modules.
FasteningHooks into the rafters with timber screws, minimum 25 mm embedment. Rail to hook and clamps 16 to 20 N·m.The hook must not bear on the tile; raise it with a timber block if needed.

Materials and corrosion by site

  • Tile and slate hooks: SUS304 stainless steel.
  • PRO Rail 47 and clamps: AL6005-T5 aluminium, anodised to 10 µm.
  • Splice star washers pierce the anodising to bond the rails; clamp bonding pins and earthing clips bond the module frames.
  • Tiles, battens, timber screws and PV modules are not in the Lumasol component list.
Warranty and interface spacing by ISO 9223 corrosion class
Site classSUS304 hooks and fixingsAluminium rail and clampsGalvanised steel partsInterface spacing
C1 to C3Inland20 years20 years20 yearsAs designed, up to 1.5 m
C4Coastal or industrial20 years20 yearsNot warrantedReduce by 5%
C5SevereNot warrantedNot warrantedNot warranted—
  • Classes to ISO 9223. Warranty from delivery, with the product registered within 30 days of purchase.
  • Where a site's class is uncertain, treat it as the higher class and confirm it with Lumasol.
Corrosion classes and the full warranty table

Spacing and design basis

The conditions the tile manual sets for the full 1.5 m hook spacing.

Interface spacing conditions by configuration
ConditionPortrait, landscape and adjustable hooks
Maximum hook spacing1.5 m, following the truss spacing
Roof heightUp to 10 m
Roof tiltUp to 25°
Roof zoneZone H
Terrain categoryDesigned for C. Factors for A (90%) and B (95%)
C4 siteReduce spacing by 5%
Rail end overhangUp to 40% of the last span
Gap between modulesAt least 18 mm down the slope
  • Roof slopes 0° to 30° and installation heights up to 20 m; outside these, a project-specific engineering certificate is needed.
  • Outside these limits, reduce the spacing and confirm it with Lumasol before installing.
  • Rails must sit within the module's clamping zones; take them from the module manufacturer's manual.

Installation

The sequence from the Lumasol manual, for the portrait hook. The manual is the reference on site.

  1. Step 1: Plan the layout

    • Confirm the wind region, terrain category, ISO 9223 class, roof height and slope (0° to 30°).
    • Allow at least 18 mm between modules down the slope.
    • Set the hook spacing along the rail by the rafter spacing, no more than 1500 mm; set the rail spacing inside the module's clamping zones.
  2. Step 2: Fix the hooks

    • Remove the tiles at the marked positions, or push them up slightly.
    • Fix each hook to the rafter with timber screws, at least 25 mm embedment: 3/8" hex socket, no more than 3,000 RPM.
    • The hook must not press on the tile: raise it with a timber block if needed, and grind a recess in the tile above so it lies flat.
    • Set the hooks out in a straight line. Never use a fitted hook as a step.
  3. Step 3: Fit the rails

    • Fix the rail to the hooks at 16 to 20 N·m once it is in position. With the height extender, fix hook and extender first, then the rail, both at 16 to 20 N·m.
    • Join rails with the splice within ¼ span of a support, never over a support or at mid-span, at 16 to 20 N·m.
    • Every rail is held by at least two hooks.
  4. Step 4: Clamp the modules

    • Fix the first module with an end clamp, lightly. Lift it slightly, slide in mid clamps with earthing clips, then place the next module.
    • Earthing clips are single use. Tighten every clamp to 16 to 20 N·m once the modules are in their final position.
Torques
FixingCodesTorque
End and mid clampsLMS-EC30-35-KIT-BP, LMS-IC30-35-KIT-BP16 to 20 N·m
Rail to hookLMS-TH1-KIT, LMS-TH2-KIT, LMS-TH4-KIT16 to 20 N·m
Rail joinerLMS-PRO-RAIL47-SP-KIT16 to 20 N·m
Grounding lugLMS-EGL-KIT16 to 20 N·m
Adjustable hook height boltLMS-TH4-KIT33 to 40 N·m

Stainless fasteners can gall. Apply force evenly along the thread, use power tools at low speed, and avoid impact drivers.

Tools

  • Allen keys
  • Nut setter or screwdriver
  • Tape measure
  • Chalk line or string
  • Spirit level
  • Marker pen
  • Torque spanner
  • Angle grinder

Tile and slate or flush mount

The nearest kit in the range, side by side, from the two manuals.

Flush mount specifications
Tile and slate compared with flush mount
FeatureTile and slateFlush mount
RoofConcrete tile, clay tile and slateMetal sheeting: IBR, Klip-Lok / Saflok, corrugated and more
FixingHooks screwed to the rafters, clear of the tilesCleats or clamps on the sheet ribs, or L-brackets
Full 1.5 m spacingRoof height up to 10 m, roof tilt up to 25°, roof zone HRoof height up to 20 m, roof tilt up to 18° or 10°
RailPRO Rail 47PRO Rail H, or Rail 47 on L-brackets
Gap between modulesAt least 18 mmAt least 18 mm

Technical questions

Does the hook rest on the tile?

No. The hook is fixed to the rafter with timber screws and must not press against the roof tile. If it is not high enough, raise it with a wooden block. Where needed, grind a recess in the tile that sits over the hook so the tile lies flat.

How are the hooks fixed?

Into the rafters with timber screws at a minimum 25 mm embedment, using a 3/8" hex socket at no more than 3,000 RPM. Never use fitted hooks as a step.

Which hook do I need?

Portrait rows use LMS-TH1-KIT and landscape rows LMS-TH2-KIT. The adjustable hook LMS-TH4-KIT adjusts in height from 56 mm to 83 mm, with the height bolt tightened to 33 to 40 N·m. A slate hook, LMS-SH1-KIT, is listed in the catalogue.

When can hooks be spaced at 1.5 m?

Roof height up to 10 m, roof tilt up to 25° and the array in roof zone H. Hook spacing along the rail follows the truss spacing and should not exceed 1500 mm. Outside these limits, reduce the spacing.

What roof pitch is covered?

Roof slopes from 0° to 30°. Outside this range a project-specific engineering certificate is required.

What about coastal sites?

SUS304 hooks and fasteners are warranted for 20 years in C1 to C4 and are not warranted in C5. In C4, reduce the interface spacing by 5%. Galvanised steel parts are warranted only in C1 to C3.

Quote a tile and slate kit

Send the roof or site, the system size and a layout if you have one. The quote request opens with tile and slate selected.