The five things every quote needs
| Send | Why it matters |
|---|---|
| The roof or site | The sheeting or tile, or ground mount or carport, so the right kit is matched. |
| The country and town | For delivery. We supply South Africa, Lesotho, Eswatini, Zimbabwe, Zambia, Botswana, Namibia, Mozambique and Angola. |
| The system size | In kWp. If it is not settled, the form takes "Not sure yet". |
| A layout | A drawing or sketch of the array: the bill of materials is built from it. |
| The timeline | When the structure needs to be on site. |
Roof details that change the kit
The quote form asks what the system mounts on, then the sheet profile or tile type. Use the notes for the rest:
- The panel model and size (the clamps take 30 mm and 35 mm frames).
- The roof height: above 20 m, a project-specific engineering certificate is needed.
- For a non-penetrative clamp, the sheet's brand and model.
- The roof slope, and the tilt you want: 5°, 10° or 20°.
- Access, and anything the layout does not show.
- The site's corrosion class to ISO 9223, if known: it sets the material and the warranty.
The roof type guide explains what each roof takes.
Ground mount and carports
For ground mount, say whether the site suits ground screws or concrete blocks, or leave it to us: foundations are designed per site, and we supply ground screws. If the ground is rock or unknown, say so: our 3-panel portrait ZAM steel mount limits foundations.
For a carport, say whether the bays run along a perimeter row or a central aisle (north facing or east and west), and whether the posts stand on ground or a slab. The carport guide explains the three systems.
Layouts and drawings
The form takes PDF, PNG, JPG, DXF or DWG up to 4 MB; email larger files to Sales@lumasol.co.za. Any layout helps, because the bill of materials is built from it. With no drawing, a sketch of the rows and the module orientation is a start.
What comes back
- A bill of materials, built from your layout: rail lengths, clamp counts and roof-interface quantities, with a price.
- Where the site needs it, an engineering pack: engineer drawings and a wind analysis report.
- A detailed installation guide for the system as designed.
- Warranty registration online. The warranty period runs from the date of delivery. It applies once the original purchaser registers it within 30 days of purchase.
Spares and parts by code
For spares, order by catalogue code from the rails and components page. One clamp kit is one clamp with its bolt and rail nut, and IBR cleats need one rail nut kit per fixing. On mini rails, order the roof clamp or mini rail kit that grips your sheet's rib, one per fixing: LMS-MRAIL-PRO-KIT (or LMS-MRAIL-PRO-EXT-KIT) for IBR, LMS-KL1-MR-KIT for Klip-Lok / Saflok, LMS-COR-MR-KIT for corrugated.
Stock and delivery
Kits are stocked in Ballito. We deliver to site by third-party logistics, overnight express or 2 to 3 days standard, or you collect from the warehouse. Outside South Africa, lead times and cross-border logistics are confirmed per order; the supply page lists the countries.
After the order
Keep the original Lumasol invoice and register the warranty on the warranty registration page. The warranty period runs from the date of delivery. It applies once the original purchaser registers it within 30 days of purchase. Unregistered, it is void.
From the field
One of the most common errors with any mounting structure is over-torquing fasteners, which stresses the fasteners and module frames. Use a torque wrench and the torque in the manual.
Other ways to send it
Call or WhatsApp 060 587 4302, or email Sales@lumasol.co.za, Monday to Friday, 08:00 to 16:30. The office and stock are at Unit 9, Wow Business Park, 2 Gourly Road, Ballito, 4420.
Questions
What does Lumasol need for a mounting quote?
The roof or site, the country and town, the system size in kWp, a layout if you have one, and when the structure is needed.
Which file types can I send?
PDF, PNG, JPG, DXF or DWG, up to 4 MB on the quote form; email larger files to Sales@lumasol.co.za.
What do I get back?
A bill of materials and a price for the structure, with the rail lengths, clamp counts and roof-interface quantities built from your layout.
Can I get a price before the system size is final?
Yes. The quote form takes "Not sure yet" for the system size, and "Budget pricing only" as a timeline.
Do I need to know which kit I want?
No. The kit family field is optional: tell us the roof or site and we match the kit.
How is the kit delivered?
To site from Ballito by third-party logistics, overnight express or 2 to 3 days standard, or collected from the warehouse. Outside South Africa, lead times are confirmed per order.



