Solar mounting guides
All guides

Choosing a solar mounting system for IBR, Klip-Lok, corrugated and tile roofs
The roof sheet or tile decides the kit: IBR and corrugated sheeting take a fixing screwed through the sheet and sealed by EPDM and bonded washers; Klip-Lok/Saflok, standing seam and Novotexi 440 take a clamp on the rib, with no hole in the roof; concrete tile, clay tile and slate take stainless steel hooks fixed to the rafters.
Updated
Penetrative vs non-penetrative roof mounting
A penetrative mount is screwed through the roof sheet and each fixing is sealed with EPDM; a non-penetrative mount clamps onto the sheet's rib or seam, so no hole is made in the roof.
Updated
Flush mount vs tilt mount: 5°, 10° and 20°
Flush mount fixes the panels parallel to the roof, at the roof's own pitch; tilt mount adds front and rear legs that set the panels at 5°, 10° or 20° where the roof gives too little angle, such as flat concrete roofs and low-pitch sheeting.
Updated
Ground mount structures: aluminium vs ZAM steel, and ground screws vs concrete blocks
Lumasol's aluminium ground mount sets are pre-assembled in seven sizes from 2V5 to 2V20, all held in stock and designed to SANS 10160 for wind up to 44 m/s; the ZAM steel set is not stocked, and is designed and customised to each site's requirements.
Updated
Solar carports for commercial parking in South Africa
Lumasol makes three solar carport systems: the lightweight Aluminium Econo for lower-traffic parking, the Hybrid steel and aluminium double-post cantilever for commercial parking, shopping centres, office parks and campuses, and the Heavy duty single-post steel cantilever for high-traffic commercial, retail and public parking.
Updated
Corrosion classes (ISO 9223) and what they mean for your warranty
ISO 9223 sorts a site's atmosphere into corrosivity categories from C1 to C5, and Lumasol's warranty period depends on the category and the material: anodised aluminium and SUS304 carry 20 years in C1 to C4, ZAM steel carries 20 years in C1 to C3 and 15 years in C4, and galvanised steel and self-tapping screws carry 20 years in C1 to C3 only.
Updated
Mini rails vs full rails
A mini rail is fixed to the roof sheet on its own and the module clamps fix straight onto it, so no long rail runs under the panels; a full-rail system runs PRO Rail H or PRO Rail 47 across cleats, clamps or brackets, and the modules clamp to the rail.
Updated
What to send for a fast, accurate mounting quote
Send the roof sheet or tile (or say ground mount or carport), the town or area, the system size in kWp, a layout or drawing, and when the structure is needed.
Updated
What we see go wrong on site: notes from a mounting structure supplier
Most structure failures we hear about aren't product failures. They're installation shortcuts.
Updated